Notice to Bidders

Wild Fish Conservancy

Dosewallips Estuary Restoration Project

 

Sealed bids for the following Public Works Project will be received until 3:00 PM, June 25, 2008 at 15629 Main Street, Duvall, WA 98019. Proposals will then and there be opened and publicly read.  

Engineer’s estimated project cost is $155,000-$199,000 with tax. Contractor will provide all labor, materials (except LWD and piles) and equipment to strategically place 5 LWD jams at RM 0-1.0 in the Dosewallips River, in the Town of Brinnon.  

A required Pre-bid Conference will be held on site June 13th.  All interested bidders shall meet at the Southeast parking lot of the Dosewallips State Park at 10:00 AM. 

Download Signed Drawings 

Download Contract and Specifications

Download Contract and Specifications Consolidated Addendum 1

Download RFI 001 Response

Download RFI 002 Response

Download RFI 003 Response

Download RFI 004 Response

Download RFI 005 Response

For questions contact: Micah Wait, Ecologist, Wild Fish Conservancy (206) 953-9305.